The contract model is Nye Veier's first total construction with integrated interaction, which means that the executing contractor will help in the regulatory process. The contract value is NOK 1.75 billion ex. sales taxes. Main Contractor: Hæhre. The project consists of: 7 kilometres four-lane highway with speed limit 110 km/h. 6 kilometres two-lane road with speed limit 90 km/h. Detail Zoning Part 1 of 2 adopted 5. September 2019. Fixed asset contract signed: October 9, 2019. The project is expected to be completed June 2022. Consists of: two-level intersections, and connecting two-lane road to existing E39 at Mandal town. Longer bridges: Dalan Bridge 110 meters. Ramsdalen Bridge 170 meters. Game crossbreeds, cool hosts for local and operating roads.

Contact information
14
km
1
tunnel
2
bridges
2019
construction start
2022
road open